Schedule of Process Optimization

Precondition for any process simulation and optimization is the exact determination of technical, technological and chemical source data. Required source data consist of: Any first-time optimization of a reformer/ platformer unit will take 35 production days. After that, subsequent optimizations will only take 3 production days, and this only in case of source data changes. The UniSARA simulation- and optimization model is constantly being improved and is always reflecting the newest technological standards. It is fully prepared and ready for the stage of industrial market introduction. Employing this simulation model for reformer block optimization does not cause project costs, as there are plans for sharing profits from extra production achieved by the model guaranteed to the company.